Hawks Engineering

Assembly Shop — Bilal

Issue plated parts from Transit-2 · receive finished assemblies into Central Store

Assembly · Online
Issued today
176
parts from Transit-2
Received to CS
175
finished hinges
QC reject
1 LH
rework triggered
Receive finished hinges
Posting routes parts through QC Inspection before they appear in dispatchable FG stock.
Recent CS receipts (1)
CS-RCV-2026-04-1188Male Hinge FR UPRH 90 · LH 85Posted